Monday, March 7, 2011

Assabet Chugging Through Maynard Today


The Assabet River was offering the fastest route through Maynard this afternoon.  Last night's heavy rain combined with two days of snowmelt have given the river a heavy workload and she's not slowing down in the slightest, as she races under Main Street. For folks with the right boat and paddling skills, I imagine this looks tempting.  I, on the other hand, prefer things a little more sedate. 

1 comment:

Erik Eckilson said...

Looks good - except for that low bridge. Its a good time to be careful on the water.